» » Tipper - The Critical Path
Tipper - The Critical Path

Tipper - The Critical Path

Musician: Tipper
Album title: The Critical Path
Style: Breakbeat, Abstract
Released: 1999
Country: UK
Size MP3 version: 1545 mb
Size APE version: 1966 mb
Size WMA version: 1508 mb
Rating ✫: 4.8
Votes: 173
Format: RA WMA AAC MMF DMF ASF MP2
Genre: Electronic

Tipper - The Critical Path


Tracklist Hide Credits

1 Seldom Vile 5:15
2 L.E.D Down
Lyrics By – TipperVocals – Sophie Barker
4:40
3 Turn 5:20
4 Twister 4:51
5 Sort Code 5:51

Companies, etc.

  • Phonographic Copyright (p) – Sony Music Entertainment (UK) Ltd.
  • Copyright (c) – Sony Music Entertainment (UK) Ltd.
  • Published By – Chrysalis Music Ltd.

Credits

  • Arranged By [Strings] – Noel Vine (tracks: 2, 3), Tipper (tracks: 2, 3)
  • Artwork [Airbrush Art] – Adrian Chestermann*
  • Design – The Designers Republic
  • Strings – City String Orchestra (tracks: 2, 3)
  • Written-By, Producer – Tipper

Notes

Promotional sampler for The Critical Path album.

Sony Music Entertainment (UK) Ltd decline any responsibility for loss, damage or death as a result of exploiting this Tipper production.

Original sound recording made by Sony Music Entertainment (UK) Ltd. The copyright in the sound recording is owned by Sony Music Entertainment (UK) Ltd. ℗ 1999 Sony Music Entertainment (UK) Ltd. © 1999 Sony Music Entertainment (UK) Ltd.

Barcode and Other Identifiers

  • Rights Society: MCPS/BIEM/SDRM
  • Matrix / Runout: SONY MUSIC IFPI L551 S0100281752-0101 11 A2
  • Mastering SID Code: IFPI L551
  • Mould SID Code: IFPI 946C

Other versions

Category Artist Title (Format) Label Category Country Year
HG 039 Tipper The Critical Path ‎(2x12", Promo) Higher Ground HG 039 UK 1999

Link: